Dam site selection
Laxiwa Hydropower Station 750000 volt outlet building is currently the highest voltage level and the maximum load in northern China outdoor, it is the reinforced concrete structure, the length of the building is 126.80 meters, 30.8 meters wide, the maximum height is 55.5 meters, it is equaled to 18 story building. According to elevation, it is divided into two layers, the first layer is reactor layer, the second layer is the outlet device layer. According to the level of the building, it is divided into Xining outlet area and Guan ting outlet area. Because the Laxiwa canyon is narrow, the project layout is restricted by the field, the Yellow River engineering construction company and the design unit designed so huge buildings cleverly at a distance of 300 meters high precipitous cliffs. Cut out a platform in the halfway, built up to 55 metres building, add the new scenery for the bright Laxiwa hydropower station. |
|
|